Service

Kitchen & Bath Remodeling in Twin Cities Metro, MN

Kitchen and bathroom remodels are the highest-ROI projects in most homes — and also the most disruptive. Losing your kitchen for six weeks is a real cost, and it gets worse when a project stalls waiting on a cabinet order nobody tracked or an inspection nobody scheduled. We manage the sequence so downtime is minimized: demo and rough-in happen fast, inspections are pre-scheduled, and cabinet and fixture lead times are confirmed and built into the schedule before we start. In older Twin Cities homes, demo frequently turns up outdated wiring, plumbing that doesn't meet code, or subfloor that needs work — we plan for that possibility up front rather than discovering it midway through and handing you a change order.

About this service

  • Lead times confirmed before project start
  • Rough-in and inspection on a fixed schedule
  • Temporary kitchen available for long remodels
  • Final walkthrough and punch list completion

Kitchen and bath done on schedule

  • Pre-confirmed lead times — Cabinets, fixtures, and tile are ordered and confirmed before demolition begins.
  • Compressed demo and rough-in — Inspections are booked in advance and built into the timeline, not requested after the work is done and the schedule is already slipping.
  • Surprises planned for — Older homes hide things. We budget time for what demo might reveal and tell you immediately — with options and real numbers, not a surprise invoice.
  • Surprises planned for — Older homes hide things. We budget time for what demo might reveal and tell you immediately — with options and real numbers, not a surprise invoice.

Common renovation projects

  • Layout changes and wall removal
  • Kitchens and bathrooms
  • Systems updates — electrical, plumbing, HVAC
  • Commercial tenant improvements

How renovations works with Level Up Remodeling

  1. Assess

    Existing conditions reviewed.

  2. Scope and plan

    A written scope and schedule.

  3. Build

    Demolition, rough-in and finishes.

  4. Close out

    Inspections and final walkthrough.

What affects the cost of renovations

Every job is quoted after we see it — these are the things that move the number:

Scope

How much is changing.

Existing conditions

Surprises behind walls.

Systems

Updating electrical, plumbing and HVAC.

Finishes

Selections.

Renovations FAQs

Can you work in an occupied building?

Yes, with phasing and protection.

Do you handle design?

We work with your designer or can recommend one.

What about surprises?

We stop, show you, and price changes in writing.

What customers say about Level Up Remodeling

Reviews provided by Elfsight, which receives your IP address and may set cookies.

Recent projects

Rustic sliding barn doors in remodeled Twin Cities basement

Rustic sliding barn doors in remodeled Twin Cities basement

Bathroom renovation with hexagonal floor tiles and new fixtures

Bathroom renovation with hexagonal floor tiles and new fixtures

Modern glass shower enclosure in updated bathroom setting

Modern glass shower enclosure in updated bathroom setting

Contemporary kitchen with stainless steel appliances and granite countertops

Contemporary kitchen with stainless steel appliances and granite countertops

Stylish shower with marble shelves and black fixtures

Stylish shower with marble shelves and black fixtures

Updated bathroom featuring subway tiles and glass block window

Updated bathroom featuring subway tiles and glass block window

Have a project in mind?

Send us your plans or ideas and request a detailed bid.

KFANBBB Accredited Business